·Certificates:ISO 9001 Quality Management System CertifiedAchilles Joint Qualification SystemAmerican Bureau of ShippingAmerican Recovery and Reinvestment Act+2 more
Every payment is processed via Razorpay with PCI-DSS data protection and SSL encryption. We never see your card details.
PayUPIVisaMCAmexRuPayNet BankingWalletsPay Later+ more
Money-back protection
Claim a refund if your order doesn't ship, arrives damaged, or doesn't match the agreed spec. Disputes resolved within 7 working days.
Trade Assurance — not yet enrolled by this seller
This seller has not yet activated Trade Assurance. Pay outside BharatSeal at your own risk — we recommend chatting first to verify.
Only orders placed and paid through BharatSeal can enjoy free protection by 🛡 BharatSeal Trade Assurance.
Service
123-day production
Standard lead time once order is confirmed.
Highlights at a glance
✓Brand: EXTREN DWB®
✓Category: Bridge Components
✓Made in Kolkata, WB, India
✓Minimum order: 123 units
✓Lead time: 123 days
✓Certified: ISO 9001 Quality Management System Certified, Achilles Joint Qualification System, American Bureau of Shipping
About this item
8" x 6" EXTREN DWB® double-web beams replaced 10" wide flange steel beams in an 18 foot span, two-lane bridge.
Bridge upgraded from a 10-ton to 20-ton capacity.
Total construction time for steel beam removal and replacement with composite beams and a timber deck was less than five days.
FRP hybrid 8" x 6" double-web beam has carbon fiber in the flanges to increase stiffness to more than six million psi.
Unique double-web design featuring internal flange stiffeners provided a beam with less than 1/2% rotation under three-point loading in laboratory tests.
Description
8" x 6" EXTREN DWB® double-web beams replaced 10" wide flange steel beams in the 18 foot span, two-lane bridge. The bridge was upgraded from a 10-ton to 20-ton capacity after the rusted, severely deteriorated steel beams were replaced. Total construction time for steel beam removal and replacement with the composite beams and a timber deck was less than five days. The bridge utilized Strongwell's FRP hybrid 8" x 6" double-web beam that has carbon fiber in the flanges to increase the beam's stiffness to more than six million psi. The unique double-web design featuring internal flange stiffeners also provided a beam with less than 1/2% rotation under three-point loading in laboratory tests.
Key attributes
Category
Bridge Components
Brand
EXTREN DWB®
Place of origin
Kolkata, WB, India
Minimum order
123 units
Lead time
123 days
Dimensions
1.23 × 1.23 × 1.23 null
Weight
1.23 kg
Packaging & delivery
Carton size
1.23 × 1.23 × 1.23 null
Gross weight per unit
1.23 kg
Certificates
ISO 9001 Quality Management System Certified
Achilles Joint Qualification System
American Bureau of Shipping
American Recovery and Reinvestment Act
ASTM F3059
Association of American Railroads
Bureau Veritas
Det Norske Veritas
Environmental Product Declaration (EPD)
Korean Register
LLOYD'S REGISTER
CITY OF LOS ANGELES RESEARCH REPORT L.A.R.R.
NIPPON KAIJI KYOKAI
NSF
Reviews
Questions & answers
Ask the supplier — answers are visible to all buyers