About this scheme
Gujarat Solar Power Policy 2021 allows MSMEs to install rooftop solar up to 50% of contracted load, net-meter excess to grid, and avail capital subsidy. Reduces electricity costs by 40-60%.
What you get
- 20-40% capital subsidy on solar plant (rate by MW size)
- Net metering: excess generation credited at average pooled cost
- Banking facility: store credits for off-season use
- No electricity duty on solar generation
- Accelerated depreciation 40% in year 1
- Reduces grid electricity cost by 40-60%
Who qualifies
MSMEs in Gujarat with own building (or long lease) and an existing electricity connection. Both LT and HT consumers eligible.
All industries qualify (no NIC restriction).
Business types
ProprietorshipsPartnershipsPrivate LimitedLLPsOne Person Companies
States
GJ
How to apply
- 1Get rooftop survey from empanelled developer
- 2Apply via GEDA portal + DISCOM net-metering form
- 3Sign PPA + commission solar plant (60-120 days)
- 4GEDA verifies installation, releases subsidy
- 5Net-metering activated by DISCOM
- 6Monthly bill reflects solar credits
Key terms and conditions
- 25-year power purchase / banking arrangement
- Solar plant up to 50% of contracted load
- Annual export limit per DISCOM rules
- O&M responsibility on the MSME
What disqualifies you
- Building without ownership/long lease excluded
- Tenant MSMEs need landlord consent + NOC
- Existing solar installations get partial benefits
Documents typically required
- Electricity connection
- Building ownership/long lease
- Udyam registration
The content above is compiled from public information published by the scheme authority. Eligibility, benefits, and procedures are subject to change. Confirm details directly with the official portal before applying. BharatSeal does not process scheme applications.