Back to all profiles
PMEGP Sample DPR Hot in 2026

Solar Water Heater

Rural Engg. And Bio-Tech Industry

Reference cost
₹8.6 L
Last reviewed
Pre-2022 (KVIC)
File
PDF · 0.0 MB
Download PDF Source on KVIC eportal
BharatSeal · Smart DPR available
Open the Smart DPR — live May 2026 prices, 5-year P&L, scenarios, EMI schedule and bank-ready PDF

Why this is hot in 2026

ECBC 2024 mandates that all hotels, hospitals and large buildings (>20,000 m²) meet 40% of hot-water load via solar. PM Surya Ghar's ₹78,000 rooftop subsidy is dragging the entire solar trades ecosystem along — installers report 60-70% of household hot-water demand met per system. B2B hotel/hospital retrofit is the under-served lane. Add ~25–30% to KVIC's costing.

BharatSeal editorial analysis, May 2026. Market figures cited above are sourced from APEDA, KVIC, PIB, IMARC, Mordor Intelligence and similar primary references.

Use as template, not as a quote.Cost line-items in this profile reflect KVIC's publication date (mostly pre-2022). Diesel, electricity, raw-material rates and minimum wages have shifted meaningfully. Your bank will require a refreshed DPR with today's quotes before sanctioning the PMEGP loan.
Use the toolbar inside the preview for zoom, rotate, search, print and download. Open in new tab

PDF authored by KVIC, Ministry of MSME, Government of India. Re-hosted on BharatSeal with attribution; original at kviconline.gov.in.